Asbestos Sprayed-on Fireproofing Over Structural Steel

The Challenge:

Deteriorating Asbestos sprayed-on fireproofing over structural steel in the elevator control room required cleaning up every three to four months.

The building’s engineers were looking for an environmentally sound and cost effective solution to this maintenance challenge.

Benefits Desired:

• Green and Super Compliant Zero VOC Coatings
• Tight Seal Over Asbestos Fireproofing
• Class A Fire Rating
• Durable, Long Lasting
• Highly Impact and Abuse Resistant
• Cost Effective
• No Downtime
• No Odor

Results:

A Class A Fire Rated GLOBAL Encasement, Inc. System was installed providing the building owners with a safe, highly impact and seismic resistant, durable, long lasting system. The products used included award winning PrepLESS PrimerTM and AsbestoSafe® TopCoat.
Abatement was performed in one weekend and owners reported that the job paid for itself in saved maintenance costs over a twelve month period.

CUSTOM JAVASCRIPT / HTML