The Challenge:

Extensive Hurricane Damage to this Ocean Front Hotel Resulted in a Subsequent Mold and Mildew Condition on the Interior.

 

Benefits Desired:

  • Class A Fire Rating
  • Kill Mold and Mildew
  • Impact and Abuse Resistant
  • Cost Effective
  • Long Lasting Solution

 

 

 

Results:

The Trio System was Designed Using PremeClean to Remove All Gross Filth from the Walls. This was Followed by DeMold™, which was used to Kill 99.9% of the Mold Spores that had Taken Hold on the Walls. MOLDon’t™ TopCoat was Used as a Finish Coat that Doesn’t Allow Mold to Grow on the Surface. Repair Costs were Mitigated as the Wall Sheathing was Able to Be Salvaged, Rather than Torn Out and Replaced.

 

Approved Applicator:  John Wayne Construction, Inc., Plantation, FL

 

 

 

 