CH#144 - Department of Energy, Building #703-A

 

 

Department of Energy, Building #703-A

 

 

 

 

 

The Challenge:

The Department of Energy was Concerned About Water Leakage of the Windows on this Large 2 Story Transite Office Building. Prior to Discovering GLOBAL Encasement, Inc. the Department of Energy was in the Process of Contracting to Replace All the Windows.
 

    

Before                                                                              After

 

Benefits Desired:

  • Waterproof Seal
  • Little to No Surface Preparation
  • No Hazardous Waste Generation
  • Class A Fire Rating
  • Long Term Solution and Cost Effective
  • 20 Year Warranty
  • Impact-and Abuse-Resistance
  • Non-Toxic and Zero VOCs
  • Bridge Cracks
  • Halt Corrosion
  • Custom-tinted Colors
  • Aesthetically Improved Building Appearance
     

 

Results:

A Product System was Designed to Correct the Window Leaking Challenge. Each Window Bay was Coated with PrepLESS Primer and AsbestoSafe® TopCoat Tinted Grey for Aesthetic Purposes. The Glazing Compound (Asbestos), the Loose Lead-Based Paint (LBP) on the Mullions and the Transite Wall Inside Each Bay were Encased and Waterproofed. As a Result of Using GLOBAL Encasement, Inc. Materials, the Department of Energy was Able to Cancel the Window Replacement Contract; and Saved in excess of $500,000 on this Single Project.

 

 

 

 

 