025 - Hot Creek Fish Hatchery
|
The Challenge: Stabilize the badly peeling and flaking Lead-Based Paint on multiple buildings. Many of the buildings being encased were residential. It was imperative that the generation of hazardous material be kept to a minimum. Also a concern was weather conditions from 0° to 100°F, sand storms, hail storms and heavy snow.
|
|
|
Benefits Desired: Class A fire-rated 20-year Warranty Minimum Hazardous Waste Generation Minimum Surface Preparation Non-toxic Low VOCs Easy to Apply
|
|
|
Results: A GLOBAL Encasement, Inc. System was designed that included PrepLESS Primer™ and LeadLock™ Top Coat. All benefits desired were realized. |
|

